Cherepetskaya SDPP

Turnkey construction of two coal-based generating units No. 8 and No.9 of 225 MW capacity each.

Customer – JSC INTER RAO – Electric Power Plants

The project provided for construction of two coal-based generating units of total installed capacity 450 MW at the site of Cherepetskaya SDPP. Commissioning of the Cherepetskaya SDPP new power units ensured the power consumers demand in the Central Region of Russia and allowed decommissioning of inefficient capacities. Construction of power generating unit No.8 was completed in 2014, unit No 9 - 2nd quarter of 2015.

Main equipment

  • Two steam turbines K-225-12.8-4Р type, manufactured by JSC Power Machines;
  • Two boiler unit Ep-630-13.8-565/570KT (Model TPE-223), manufactured by OJSC EMAlliance

Technical and economic performance

Designed electric capacity of the power generating unit to be put into operation 450 MW
Installed capacity of the power generating object including put into operation of the new power generating unit 1 735 MW
Main project fuel Kuznetsk coal of DG mark
Fuel consumption rate 1 017 778 th. tonne of fuel equivalent/per year
Degree of efficiency of electric power by output 37.2%
Specific reference fuel consumption for electric power output 330.3 GOE/kW*per hour