Other


Turnkey construction of a coal-based generating unit No 3 of 225 MW at the site of Kharanorskaya SDPP
Customer — JSC INTER RAO — Electrogeneration
The power unit commissioning increased the power supply reliability of Zabaikalsky Krai consumers including those on the part of large industrial enterprises.
Сore equipment
- Steam turbine of К-225-12.8-3Р type, manufactured by JSC Power Machines;
- Boiler unit Ep-630-13.8 565BТ (TPE-216М), manufactured by JSC EMAlliance.
Construction of power generating unit No.3 was completed in 2012.