Other Implemented Projects


Turnkey construction of a coal-based generating unit No 3 of 225 MW at the site of Kharanorskaya SDPP
Customer — JSC INTER RAO — Electrogeneration
The power unit commissioning increased the power supply reliability of Zabaikalsky Krai consumers including those on the part of large industrial enterprises.
Construction of power generating unit No.3 was completed in 2012.
Сore equipment
- Steam turbine of К-225-12.8-3Р type, manufactured by JSC Power Machines;
- Boiler unit Ep-630-13.8 565BТ (TPE-216М), manufactured by JSC EMAlliance.
Fuel type: Coal