Bolshaya Pirogovskaya str., 27 building 4, Moskva, Russia, 119435  •  +7 (495) 664–88–40  •  irao-e@interrao.ru

Omskaya CHPP – 3

Turnkey construction of a combined cycle power unit of 85 MW at the industrial site of Omskaya CHPP – 3

Customer – JSC TGK-11

Power unit commissioning reduced the power deficiency in Omsk Region and provided a reliable heat supply to community areas under construction and large enterprises of the petrochemical complex.

Main equipment

  • Two gas turbine power units LM2500+G4 DLE, manufactured by General Electric;
  • Two waste boilers Е-38.3/8.1-5.5/0.63, manufactured by JSC EMAlliance;
  • Steam turbineТ-16.5/22-5.5/0.08, manufactured by JSC Kaluzhsky Turbine Plant.

Putting into operation of new power generating units of Yuzhnouralskaya SDPP will sufficiently enhance reliability of power supply for industrial enterprises and domestic consumers of the Southern Urals.

Fuel type: Natural gas

Power Plant was launched in 2013.

LLC Inter RAO — Engineering
© 2012–2019