Construction of the power plant comprising four combined cycle power units with a total capacity of 455,2 MW
Customer: Kaliningrad Generation LLC
Construction of the plant is conducted on the site adjacent to Kaliningrad CHPP-2. Pregolskaya TPP includes four combined cycle power units with each unit capacity of 113,8 MW. New power sources will not only provide the energy security in the region, but also make its power grid more flexible.
Power Plant was launched in 2019
Core equipment
- Four gas turbines PG6111 (FA) manufactured by LLC Russian Gas Turbines
- Four generators TF-90G-2U3 manufactured by CJSC ELSIB
- Four steam turbines К-38-8,0 manufactured by JSC Power Machines
- Four waste-heat recovery units manufactured by JSC Machine-Building Factory of Podolsk
Key Performance Indicators
Number of units |
4 |
Total installed capacity, MW |
455,2 |
Rated specific fuel equivalent consumption, g.e.f./kWh |
236,8 |
Efficiency, % |
51,8 |
Fuel type – Natural gas