Bolshaya Pirogovskaya str., 27 building 4, Moskva, Russia, 119435  •  +7 (495) 664–88–40  •  irao-e@interrao.ru

Pregolskaya TPP

Other Projects in progress

Construction of the power plant comprising four combined cycle power units with a total capacity of 456 MW

Customer: Kaliningrad Generation LLC

Construction of the plant is conducted on the site adjacent to Kaliningrad CHPP-2. Pregolskaya TPP includes four combined cycle power units with each unit capacity of 110 MW. New power sources will not only provide the energy security in the region, but also make its power grid more flexible.

The project completion is scheduled for the second quarter of 2019.

Core equipment

  • Four gas turbines PG6111 (FA) manufactured by LLC Russian Gas Turbines
  • Four generators TF-90G-2U3 manufactured by CJSC ELSIB
  • Four steam turbines К-38-8,0 manufactured by JSC Power Machines
  • Four waste-heat recovery units manufactured by JSC Machine-Building Factory of Podolsk

Key Performance Indicators

Number of units

4

Total installed capacity, MW

456

Rated specific fuel equivalent consumption, g.e.f./kWh

240

Efficiency, %

51,2

Fuel type – Natural gas

Kaliningrad, Russian Federation
Show in map
LLC Inter RAO — Engineering
© 2012–2018