Construction of a power plant comprising three steam-power units with a total capacity of 195 MW

Customer: Kaliningrad Generation LLC

Construction of the coal power plant is conducted in Svetly urban district. Primorskaya TPP includes three steam-power units with generation equipment unit capacity of 65 MW. Implementation of the project will help diversify the fuel balance of the Kaliningrad electric power system. The project completion is scheduled on the third quarter of 2020.

Core equipment

  • Three steam turbines with a capacity of 65 MW, type UTW K-65-13,0 65 MW, manufactured by CJSC The Ural Turbine Works
  • Three turbogenerators TF-65-2UHL4 manufactured by CJSC ELSIB
  • Three steam boilers E-240-13,8-560KT manufactured by JSC Machine-Building Factory of Podolsk

Key Performance Indicators

Number of units 3
Total installed capacity, MW 195
Rated specific fuel equivalent consumption, g.e.f./kWh 353
Efficiency, % 35.6

Fuel type - Kuznetsk black coal.

Svetly, Kaliningrad region, Russian Federation