Turnkey construction of CCGT No 3 with the capacity of 80 MW in the site of Sochinskaya TPP

Customer: JSC INTER RAO UES

After the new Sochinskaya TPP power unit was put into operation in 2009, the installed capacity of the power plant doubled and power supply reliability in the region increased.

Core equipment

  • Gas Turbine GT10S, Manufacturer: Siemens (Germany);
  • Double Pressure Waste Heat Boiler P-103, Manufacturer: JSC Podolsky Machinery Construction Plant;
  • Steam Turbine Т-10/11-5.2, Manufacturer: JSC Kaluzhsky Turbine Plant
Fuel type: Gas

The Power Plant was launched in 2009