Сonstruction of the power plant comprising two steam gas power units with combined capacity of 800 MW
Customer — JSC INTER RAO — Electric Power Plants
The construction program of the new power complex «Yuzhnouralskaya SDPP-2» was include projects for construction of two combined cycle power generating units of total installed capacity 839 MW at the site of effective power station. Putting into operation of new power generating units of Yuzhnouralskaya SDPP was sufficiently enhance reliability of power supply for industrial enterprises and domestic consumers of the Southern Urals. Construction of power generating unit No.1 and unit No. 2 was completed in 2014.
Main equipment
- Two gas turbines power unit SGT-4000F, manufactured by Siemens;
- Two waste boilers P-140, manufactured by JSC Atomenegromash;
- Two steam turbines unit of condensate type SSТ-3000, manufactured by Siemens.
Technical and economic performance
Designed electric capacity of the power generating units to be put into operation | 800 MW |
Main project fuel | Natural gas |
Fuel consumption rate | 1394 th. tonne of fuel equivalent/per year |
Degree of efficiency of electric power by output | 54.79% |
Specific reference fuel consumption for electric power output | 225 GOE/kW*per hour |